Singareni plans State’s first pumped storage power project near closed Medipally OC mine

CMD N. Balaram says the cost of the 500 MW capacity project is expected to be about ₹3,000 crore and it would have 40-year life of low-cost energy generation

Singareni plans State’s first pumped storage power project near closed Medipally OC mine
CMD N. Balaram says the cost of the 500 MW capacity project is expected to be about ₹3,000 crore and it would have 40-year life of low-cost energy generation